Pine Nuts  - Pinus Pinea L.

Pine Nuts
Product Technical Specifications
Revision No: 1
Page No: 1/2
Document No: 10.62.035
Publication Date 08.07.2009

Product Name: Product Code: Product Quality Plan No:
Pine Nuts 201 001 201 000          10.72.031

  Name Code
Used Raw Materials Pine Nut Kernels 101 001 201 000
     
Used Packing Materials 10 kg Carton Box 103 000 501 004
25 kg PE Bags 103 000 501 003                                 
Used Auxiliary Materials Tape 103 000 204 008
White Paper 101 003 801 001
Methyl Bromide 102 000 101 012
Cotton Bag 102 000 201 019
Cotton Rope 101 001 201 020
1. Physical Properties

Physical Specifications Acceptance Criteria Tolerance AnalyseMethod Referance
1. Colour White to pale cream - Eye Detection 10.23.001
2. Impurity Max %1 - Physical analysis 10.23.002
3. Number of kernels in 100 gr 550 ±50 Physical Analysis 10.23.002
4. Broken %2 ±0,5 Physical Analysis 10.23.002

2. Chemical Properties

Chemical Specifications Acceptance Criteria Tolerance Analyse Method Referance
1. Moisture Content Max %7 ±2 105'C oven 10.23.021

3. Microbiological Properties
Microbial load of product must be below the human body acceptable level.If the purchasing company informs us about his own acceptable levels , a represantative sample will be forwarded to an official laboratory to check the levels on buyers account.

4. Packing Properties
  Product Name Unit weight Product Code Packing Method
Pine Nuts(In Carton Box) 10 Kg N 201 001 201 000   

First the cartons are wrapped  inside with white paper. 10 kg net  pine nuts are filled  and weighted . Cartons are closed afterwards with a tape.

Pine Nuts (In bag) 25 Kg N 201 001 201 001    

25 kg  net pine nuts are filled into cotton bag and sewed with cotton rope.

Pine Nuts ( in vacuum bag) 2 x 5 kg 201 001 201 002

5 kg net pine nuts are wighed and filled into a pe bag and than vacuumed and sealed with heat. 2 vacuumed bag are put into one carton

5. Labelling
Labelling of every package is done according to our Label Technical Procedure. Unit weight is written on the specified part of label.All the packages carry the label.

6. Warehousing And Transport
     Ready packages must be kept on dry and dark warehouses. The carrying vehicle must be very clean and every precautions  must be taken to prevent any damage of rain and water. Overseas transport is done by closed containers .If the delivery will be done  by container it will be fumigated in the container; in case of the delivery will be done by truck  the lot will be fumigated before loading.

 

Prepared by
Quality Assurance Chief
Accepted by
Quality Management Represantative


  • Product Specifications Main Page
  • Figsan Online Main Page